Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Karachi: ‘DHA roads to be repaired by June’
01-25-2009, 11:03 AM
Post: #1
Karachi: ‘DHA roads to be repaired by June’
Cogen Power and Desalination Plant to be operational in March
A number of major roads in DHA will be constructed and carpeted within two weeks, while the repair of all roads dug up to lay a new drainage system in the area will be completed by June, DHA Administrator Brig. Khalid Tirmizi has said.

Moreover, work on the Gizri flyover project has been progressing according to the amended design and will also be completed by June, he said. The DHA administrator was speaking at a reception hosted by the Defence Residents’ Society (DRS).

The DHA Cogen Power and Desalination Plant that had been out of order for the last three months would become operational by early March after damaged auxiliary parts of the plant are repaired and replaced.

Brig. Tirmizi further said that DHA was working out a security plan in collaboration with security agencies and by taking residentsí associations and the Citizens-Police Liaison Committee (CPLC) on boards. The Cantonment Board Clifton (CBC) has also been directed to improve civic amenities such as sewerage, road repairs, streetlights, and sanitation and garbage collection in the area, the DHA administrator said.

City Naib Nazim Nasreen Jalil said that the Karachi Water and Sewerage Board (KWSB) would enhance bulk water supply to the DHA after the completion of its K-IV water supply project. This would help the DHA to overcome water shortage in the area.

DRS President Zafar Iqbal highlighted the role of the residentsí associations in getting civic and utility issues resolved in the area.

http://www.thenews.com.pk/daily_detail.asp?id=159003
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Commercialisation: LDA to assume control of buildings on 147 roads Salman 0 4,730 03-20-2014 02:54 PM
Last Post: Salman
  Cantonment areas to have signal-free roads Salman 0 5,678 12-21-2013 12:34 PM
Last Post: Salman
  LDA to install 136,000 LED lights on city roads Salman 0 6,709 12-02-2013 01:52 PM
Last Post: Salman
  LDA Plans To Install LED Lights On Roads Salman 0 6,178 12-02-2013 01:48 PM
Last Post: Salman
  CDA allocates Rs 8 millions for roads’ repair Salman 0 7,585 09-24-2013 11:43 AM
Last Post: Salman
  CDA yet to start maintenance work on damaged roads Salman 0 4,895 09-16-2013 04:41 PM
Last Post: Salman
  National assets: PM prioritises repair of roads Salman 0 6,034 07-19-2013 12:13 PM
Last Post: Salman
  Energy, roads to consume much of Rs1.15tr PSDP Salman 0 3,784 06-13-2013 01:19 PM
Last Post: Salman
  CDA’s negligence worsens condition of roads in Islamabad Salman 0 3,331 04-03-2013 04:47 PM
Last Post: Salman
  CDA digs up roads and leaves them like that Salman 0 3,966 01-24-2013 07:04 PM
Last Post: Salman
  Rawal Town roads to be renovated Salman 0 4,880 12-15-2012 05:20 PM
Last Post: Salman
  LDA to stop commercial activity on 48 roads Salman 0 4,457 12-14-2012 01:02 PM
Last Post: Salman
  Plea against conversion of two DHA roads allowed Salman 0 4,141 12-12-2012 01:59 PM
Last Post: Salman
  Poor condition of service roads needs immediate attention Salman 0 4,498 11-05-2012 12:01 PM
Last Post: Salman
  Capital rain-hit roads need maintenance Salman 0 4,388 09-24-2012 04:16 PM
Last Post: Salman
  1,500km roads will be built in Sindh: CM Salman 0 4,709 09-19-2012 04:22 PM
Last Post: Salman
  Roads dug up for Metro Bus Service Salman 0 7,251 09-12-2012 11:34 AM
Last Post: Salman
  Renaming roads: befitting tribute to heroes Salman 0 4,109 08-09-2012 12:03 PM
Last Post: Salman
  Roads worth Rs 39b to be constructed Salman 0 4,882 07-24-2012 05:30 PM
Last Post: Salman
  DCO orders early completion of roads Salman 0 4,470 05-17-2012 01:29 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)