Tarbela Dam can still generate 960MW more power
08-12-2008, 08:42 AM
Post: #1
Tarbela Dam can still generate 960MW more power
Israr Khan
Lack of political will and red tape have hindered generation of more than 960 megawatt expected potential energy that could be retrieved from Tarbela reservoir by carrying out a slight modification to the dam’s structure and installing two more turbines to cope with the power crisis, well placed officials told ‘The News’.

Talking to high officials and senior engineers on a visit to Tarbela Dam, this correspondent found that possibility of increasing the dam’s power generation capacity was still there. They said: “Since long, the government had planned to modify the water reservoir of Tarbela to pave way for generating about 960MW electricity, but due to lack of political will and red tape, the projects is still in the doldrums.”

There was a plan to install two more turbines at Tarbela Dam, but the said turbines would not be able to generate electricity for six to seven months. However, there was a need to introduce some modifications in the water reservoir (lake) with a view to ensuring sizeable head of water on the two proposed turbines for six to seven months to generate electricity. There is already room or provision in the original design of the water reservoir for proposed modifications and it would not affect the dam, sources in Ministry of Water and Power said.

On this particular issue, feasibility studies are being carried out for making some modifications to make the project of installing two turbines, having the capacity to generate 960MW electricity, economically viable.

Earlier, there was a proposal that the Water and Power Development Authority (Wapda) would accomplish this project of strategic significance, but due to lack of adequate financing, the authorities concerned decided that private sector should come forward to complete this project despite the fact that Tarbela Dam is a sensitive and strategic asset of the country.

This project was then handed over to the Private Power and Infrastructure Board (PPIB) and was given the task to bring the investment from any intending private company to execute the project. But, after elapsing of more than two years, even a single stone has not been overturned.

A month back the PPIB handed over the project to Wapda as they were unable to execute it. In this way a lot of time has been wasted and the project is still in cold storage. The dam has five tunnels but only three are being utilized for power generation while other two tunnels i.e. IV and V remained unattended.

Tarbela is the world’s largest earth and rock filled dam but sedimentation in the reservoir has reduced its storage capacity. The dam has now attained the installed capacity of 3,478MW from 14 units.

http://www.thenews.com.pk/daily_detail.asp?id=129568
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Pakistan Aims to Generate USD 4.5 Billion in FY23-24 from Non-IMF Sources, Says Finan LRE-Azan 0 238 12-18-2023 02:10 PM
Last Post: LRE-Azan
  Property transactions generate PKR 81 billion in revenue Federal Board of Revenue LRE-Azan 0 814 01-24-2023 03:22 PM
Last Post: LRE-Azan
  Foreign investment to boost economy, generate employment; PM Salman 0 3,852 02-11-2014 12:22 PM
Last Post: Salman
  ‘Poor’ CDA selling plots to generate funds Salman 0 3,983 07-27-2012 11:40 AM
Last Post: Salman
  ‘17 projects underway to generate 20,000MW’ Salman 0 3,732 06-01-2012 12:38 PM
Last Post: Salman
  Korean company to generate 300MW solar power Salman 0 5,066 05-11-2012 02:38 PM
Last Post: Salman
  Govt making efforts to generate cheaper electricity: Qamar Salman 0 4,538 03-20-2012 12:32 PM
Last Post: Salman
  Steps towards self-sufficiency: CDA to generate 22MW electricity from waste Salman 0 4,103 01-04-2012 02:24 PM
Last Post: Salman
  Agro Based Industry can Generate Billions of Dollars LRE 0 4,274 02-03-2010 11:54 AM
Last Post: LRE
  Chinese company: Wind mills set up in Punjab to generate power LahoreEstate 0 5,699 01-17-2010 07:02 AM
Last Post: LahoreEstate
  Thar Coal Power Project: Sindh, Engro sign agreement for power generation LahoreEstate 0 6,459 09-09-2009 06:37 AM
Last Post: LahoreEstate
  Current extra power production capacity idle, Rs 200bn for new power projects Naveed Yaseen 0 3,366 08-12-2009 09:21 AM
Last Post: Naveed Yaseen
  Bunji hydropower project to generate 7,100 MW LahoreEstate 0 3,136 08-09-2009 06:07 AM
Last Post: LahoreEstate
  Power Generation: Two power plants to be operational soon: Mian Mansha LahoreEstate 0 3,956 08-09-2009 06:04 AM
Last Post: LahoreEstate
  Lahore: Rachna Industrial park to generate 25 MW power from waste Naveed Yaseen 0 3,454 08-07-2009 06:25 AM
Last Post: Naveed Yaseen
  World Bank approves Tarbela expansion for additional 960 MW capacity Naveed Yaseen 0 2,590 07-26-2009 06:39 AM
Last Post: Naveed Yaseen
  Storage at Tarbela Dam stopped: Zardari gives water relief to Sindh Naveed Yaseen 0 2,420 06-25-2009 07:15 AM
Last Post: Naveed Yaseen
  Tarbela generation capacity to increase by 960MW 'soon' LahoreEstate 0 2,463 06-20-2009 08:20 AM
Last Post: LahoreEstate
  Dubai's luxury homes fail to generate sales at the auction LahoreEstate 0 2,981 06-01-2009 05:59 AM
Last Post: LahoreEstate
  Iran gas to generate 5,000MW, says Asim LahoreEstate 0 2,627 05-27-2009 07:39 AM
Last Post: LahoreEstate