Lahore Road Rehabilitation Project II 90% complete: FWO
08-06-2009, 07:06 AM
Post: #1
Lahore Road Rehabilitation Project II 90% complete: FWO
90pc North Lahore roads rehabilitated

Thursday, August 06, 2009
By Our Correspondent

LAHORE

FRONTIER Works Organisation (FWO) has completed almost 90 per cent road construction work under its Lahore Road Rehabilitation Project, Phase II (LRRP-II) especially in various localities of North Lahore.

In September 2008, the Punjab government had called the FWO for the LRRP-II which included renovation of roads throughout the city, construction of Shalimar Interchange, various roads in Walled City, Data Nagar, Misri Shah, Township, Johar Town, Sabzazar Housing Scheme, Allama Iqbal Town, Faisal Town, Garden Town and Model Town Extension.

North Lahore is termed the most neglected side of the provincial capital with two most important localities Data Nagar and Misri Shah. Both the areas steel furnaces, steel re-rolling mills, scrap godowns, cold storages and several other industries.

Following the heavy load of the commercial and industrial traffic, roads of these localities were in a pathetic condition and their durability was always a big question for the authorities. Under the LRRP-II, the FWO has to construct 17 roads in Misri Shah and eight in Data Nagar. In Misri Shah, three out of the 17 roads were of reinforced cement concrete (RCC) whereas remaining roads were of asphalt (Black Top) type while all the eight roads of Data Nagar were RCC.

FWO officials said most of these roads were in bad shape due to the heavy use by pedestrians and vehicular traffic. Exposure to water and moisture had been another damaging factor as most of the area remains flooded after the rains, which was highly damaging for the city’s internal roads having no proper rain and sewerage outlets.

Ghorey Shah Road and Katcha Rahim Road (Misri Shah) and PECO Road Railway Godown and Elahi Buksh Road (Data Nagar) were in extremely dilapidated condition.

After the general elections the neglected area of North Lahore has again come to the limelight of the government, which put it on top of its priority list for road construction, PWO officials said. However, the plans for these roads were though initiated in Feb 2009 but the imposition of Governor’s Rule placed the plans in suspension and final go ahead was given to the FWO by the government in mid April.

Lt Col Farrukh Rashid while talking with The News said building roads inside the City’s congested areas was difficult due to the rush and narrow passages, which impeded the movement of the material, machinery and the workforce. He said encroachments in the already narrow streets increased problems. “Another practical problem is unexpected underground situation about the sewerage and services (Sui gas, water and cable connections etc) as what lied beneath the surface remains a mystery unless the road is dug up,” he maintained. He said despite all these problems, the FWO managed to complete its task within the given time.

To overcome local problems, the FWO adopted an innovative idea and constituted committees of residents of various roads so that they could help the workers in clearing the roads from traffic, encroachments and other problems. The committees also proved to be a check on the contractors and workers too, he said adding that the residents played a positive role in achieving the targets.

http://www.thenews.com.pk/daily_detail.asp?id=191642
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CM Naqvi Drives Forward Controlled Access Corridor Band Road Project in Lahore LRE-Azan 0 244 01-24-2024 06:40 PM
Last Post: LRE-Azan
  Commissioner Announces Key Milestones and Schedule for Rawalpindi Ring Road Project LRE-Azan 0 250 01-23-2024 03:37 PM
Last Post: LRE-Azan
  Latest News Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 252 01-16-2024 02:26 PM
Last Post: LRE-Azan
  Lahore-Sialkot Motorway Link Road Project Set to Open in January LRE-Azan 0 289 01-16-2024 02:25 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road (RRR) Project: 12% Completion, Anticipated Opening in August LRE-Azan 0 255 01-02-2024 06:14 PM
Last Post: LRE-Azan
  Signal-Free Walton Road Project: Tackling 18-Kilometer Infrastructure and Drainage Is LRE-Azan 0 258 12-11-2023 04:06 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Set to Be Completed in One Year LRE-Azan 0 351 10-11-2023 07:13 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project Faces Complication of Missing Land Record LRE-Azan 0 354 09-13-2023 07:36 PM
Last Post: LRE-Azan
  Lahore New: Saggian-Sharaqpur Road Project is inaugurated by CM Parvez Elahi LRE-Azan 0 773 01-21-2023 01:04 PM
Last Post: LRE-Azan
  Rawalpindi Ring Road Project New Design is Ready LRE-Azan 0 1,390 11-20-2021 12:22 PM
Last Post: LRE-Azan
  Rawalpindi: Ring Road Project, Rs. 24 Billion Approved in PC-1 LRE-Azan 0 1,227 10-27-2021 01:04 PM
Last Post: LRE-Azan
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 4,210 08-09-2018 06:35 PM
Last Post: LRE-Azan
  Land acquisition for motorway complete, says DCO Salman 0 5,599 04-21-2015 02:42 PM
Last Post: Salman
  Shahbaz Sharif reviews Ring Road project Salman 0 6,195 03-13-2014 05:18 PM
Last Post: Salman
  CDA to complete Kashmir Highway project by May 31 Salman 0 4,419 02-25-2014 01:22 PM
Last Post: Salman
  Minister dissatisfied over delay in Kurri Road project Salman 0 4,753 02-25-2014 01:16 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,405 01-16-2014 01:55 PM
Last Post: Salman
  Lahore Ring Road Update : Southern Loop of Ring Road to be re-assessed Salman 0 9,846 01-10-2014 12:48 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 10,152 11-30-2013 12:48 PM
Last Post: Salman
  Sindh : 293 development schemes to complete by Dec 31 Salman 0 6,466 11-25-2013 01:34 PM