Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
‘Overload shedding’ enters LESCO lexicon
07-21-2008, 07:11 PM
Post: #1
‘Overload shedding’ enters LESCO lexicon
‘Overload shedding’ enters LESCO lexicon

* Official says additional load shedding of 10 to 20 minutes meant to manage excess load
* Another official says system not being upgraded despite increased burden on transmission system

By Nauman Tasleem

LAHORE: ‘Overload shedding’ is the latest term introduced by the Lahore Electric Supply Company (LESCO) to express the management of excess load by switching off any one of the three main grid stations of the city for a few minutes, sources told Daily Times on Sunday.

They said that LESCO’s transmission system was weak and could not support the load after a certain level. Therefore, LESCO had no other option but to shut down electricity “for a while”. They said that under the term, whenever the load of a locality increased, the power was cut off. LESCO officials say that they were doing it to save the electricity transmission system of the city. “We don’t have any other option,” said a LESCO official, adding that if the electricity were not shut down, the entire system would collapse, and repairing it would take hours. “It is far better to terminate power supply for a few minutes than to have blackout for hours,” he said.

The official said that three main grid stations of 220KV were working in the city, which provided electricity to small 132KV grid stations installed in different parts of the city, including Kot Lakhpat, Green Town, Wapda Town, Iqbal Town, Ghaziabad and Multan Road. From these 132KV grid stations, the electricity is distributed to consumers, he said.

Managing load: The official said that the city had observed an increase in load shedding timings in the last week, while unscheduled load shedding had also increased. He said that load shedding was usually distributed hourly –like from 10am to 11am – but in the last few days, additional load shedding of 10 to 20 minutes was being done to manage load (overload shedding), which did not come under the heads of announced or unannounced load shedding. He, however, said that overload shedding of 30 to 40 minutes had also been done in many localities.

“Whenever the load of electricity increases in any part of the city, the grid station concerned is shut down, and there is no need to follow the load shedding timetable,” another LECSO official said. He said that because of the rise in temperature, the usage of electricity had increased, which had resulted in increased load shedding.

No upgrade: “Our transmission is very weak, as a petty amount has been invested on the repair of the distribution and transmission system in recent years,” the official said, adding that the use of split and window air conditioners had increased drastically in the last six years, which had put a lot of burden on the transmission system. “Not a single megawatt has been added in several years, nor had the system been upgraded to support the increased load,” he said.

The official said that the term ‘forced load shedding’ had also been introduced a few weeks ago. “In forced load shedding, the grid station concerned receives orders from the National Control Centre (NCC) in Islamabad. The NCC orders the grid station employees to shut down the grid station immediately,” he said.

LESCO Public Relations Deputy Director Muhammad Javed could not be reached for comments despite repeated attempts.

http://www.dailytimes.com.pk/default.asp...008_pg13_1
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Islamabad : Solution For Load Shedding Salman 0 3,814 05-03-2013 11:55 AM
Last Post: Salman
  Abu Dhabi group enters in mobile financial services Salman 0 4,445 02-11-2012 12:36 PM
Last Post: Salman
  Four-hour load shedding in industrial areas announced Lahore_Real_Estate 0 4,025 02-02-2011 02:54 PM
Last Post: Lahore_Real_Estate
  Industrialists to protest against four-day gas load shedding Lahore_Real_Estate 0 3,299 11-24-2010 04:57 PM
Last Post: Lahore_Real_Estate
  LESCO & Sufferings of Poor Lahoris LRE 0 3,701 07-25-2010 05:21 PM
Last Post: LRE
  No Load-shedding In Bahria Town Lahore Lahore_Real_Estate 0 4,808 04-29-2010 12:10 PM
Last Post: Lahore_Real_Estate
  Short-term measures to reduce load-shedding (by Dr Ashfaq Hassan Khan) Naveed Yaseen 0 4,106 04-29-2010 11:25 AM
Last Post: Naveed Yaseen
  PEPCO Officials Enjoying "NO Load Shedding" LRE 1 5,434 04-28-2010 09:45 AM
Last Post: LRE
  Gilani calls energy conference on Monday to discuss load shedding Lahore_Real_Estate 0 4,030 04-17-2010 10:54 AM
Last Post: Lahore_Real_Estate
  Malik-Siddiqui row enters legal twist Lahore_Real_Estate 0 3,665 04-03-2010 12:26 PM
Last Post: Lahore_Real_Estate
  WAPDA exempts Mirpur from load shedding Lahore_Real_Estate 0 3,343 03-25-2010 03:12 PM
Last Post: Lahore_Real_Estate
  Load-shedding, criminal mismanagement by our rulers (by Sarwat Jamal Asmai) Naveed Yaseen 0 3,793 03-25-2010 01:25 PM
Last Post: Naveed Yaseen
  New rental power plants expected to reduce load shedding Lahore_Real_Estate 0 4,226 03-20-2010 12:50 PM
Last Post: Lahore_Real_Estate
  Sewage enters houses after RDA debris blocks drain Lahore_Real_Estate 0 2,724 03-18-2010 01:03 PM
Last Post: Lahore_Real_Estate
  India supporting terrorism in Pakistan, shedding crocodile tears as victim: CM Punjab Naveed Yaseen 0 3,211 11-19-2009 06:27 AM
Last Post: Naveed Yaseen
  Karachi: ‘Rainwater enters tanks of petrol pumps’ Naveed Yaseen 0 2,963 07-21-2009 10:19 AM
Last Post: Naveed Yaseen
  Only 31% use emergency lights during load-shedding: Survey Naveed Yaseen 0 2,946 06-24-2009 06:30 AM
Last Post: Naveed Yaseen
  India enters deflation as economy slows Naveed Yaseen 0 2,455 06-19-2009 07:09 AM
Last Post: Naveed Yaseen
  Load-shedding reduces investment by 60pc Naveed Yaseen 0 2,461 06-02-2009 07:37 AM
Last Post: Naveed Yaseen
  Pakistanis, Clocks, Minister Water & Power and Load Shedding LRE 0 2,583 05-08-2009 01:38 PM
Last Post: LRE

Forum Jump:


User(s) browsing this thread: 2 Guest(s)