Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
RBOD Phase-III starts despite experts’ apprehensions
04-13-2009, 07:40 AM
Post: #1
RBOD Phase-III starts despite experts’ apprehensions
KARACHI: The Water & Power Development Authority (WAPDA) has continued development work on the ongoing mega project, Right Bank Outfall Drain (RBOD) Phase-III, without solving the technical objections raised by different stakeholders.

According to experts, the project will adversely affect the biggest water reserve for Karachi that provides potable water supply to the city and many areas of Thatta district.

In 2002, during the Environmental Impact Assessment (EIA) public hearing, experts of the Sindh Wildlife Department objected that the construction of the RBOD would destroy the general ecology of the province especially its wetlands and fresh water lakes, including the Hammal Lake in the Larkana district and Manchar Lake in the Dadu district. They stated that during phase-III, the project would badly affect another freshwater lake, Haleji Lake, a protected game sanctuary and a Ramsar site.

During the visit of Haleji Lake, this scribe found heavy machinery, excavators and cranes digging the ground just 100 meters away from the embankments of the lake. The area is officially declared as a buffer zone and is also protected under the wildlife ordinance. The rules and regulations of the wildlife department reveal that a distance of around one kilometer from the embankments of the Haleji Lake, which spreads over an area of 6.59 square miles, is supposed to be a buffer zone. Since the lake has been declared a Ramsar site, no construction can be done on the lake or in the buffer zone.

It is pertinent to mention here that after signing the Ramsar Convention, the Pakistani government became bound to protect the lake and also the buffer zones, however, these rules are not being followed and remain only documents.

Since 1995, the Sindh Irrigation Department stopped providing water to the lake, which has badly affected the lake and its buffer zones. “Since the supply of fresh water from River Indus has stopped, there is no water in the buffer zones; this has badly affected the ecology and also the fishermen of the area who earn their livelihood from the ponds in the buffer zones,” said Sindh Wildlife Conservator Hussain Bux Bhaagat.

During the visit of the area the local fishermen told this scribe that in the past, there used to be a thick forest in the buffer zone area of the lake. “The officials of the Sindh Forest Department have chopped down thousands of trees converting the area into barren land,” said Siddique Mallah.

RBOD is mega project costing around Rs 29.274 billion that will drain out the agricultural effluents into the Arabian Sea from the districts of Sindh located on the right side of the River Indus. The construction of phase-III of the RBOD is posing serious threats for the survival of the lake. “The level of the RBOD is about 300 meters below the level of the lake; this means that along with agriculture effluents, lake water will also run into the RBOD,” said Bhaagat.

The Left Bank Outfall Drain (LBOD) was constructed to drain the effluent from the districts on the left side of the river. WAPDA has yet to collect the loss to the human population, livestock, wildlife, wetlands and wildlife game sanctuaries that were badly affected by the LBOD in the past. “We believe that in the future, when RBOD will start working, it will not only suck the lake water by the seepage but when it will have a massive supply of effluents, some of these effluents will in turn seep into the lake, resulting in another disaster. Thus, we asked WAPDA to redesign the project so it may not affect the lake,” stated Bhaagat.

WAPDA’s official record reveals that RBOD phase-III starts from Sehwan in the Dadu district; it runs a distance of around 273 kilometres and then reaches Gharo in the Thatta district.

“We criticise the construction of the RBOD within such a close proximity of Ramsar sites and it is very strange how WAPDA has given NOCs despite the fact that the construction of drains is prohibited within wildlife sanctuaries as per the Sindh Wildlife Act of 1972,” said National Assembly Sub-Committee on Environment Convener Marvi Memon. She added that WAPDA has also not acquired a NOC from the Sindh Environmental Protection Agency for the project, violating the environmental laws. “We have compiled a detailed report on the violations of the environmental laws in the constructions of this project and have also given detailed recommendations on how WAPDA can reduce the environmental concerns,” stated Memon.

http://www.dailytimes.com.pk/default.asp...009_pg12_7
Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Capital Administration Starts Surveying Nullahs In Islamabad Salman 0 4,540 03-26-2014 06:05 PM
Last Post: Salman
  NAB starts probe into FGEHF plots allotment, recruitment's Salman 0 4,976 02-25-2014 01:19 PM
Last Post: Salman
  Bahria Town Karachi Booking Starts Salman 0 7,867 01-27-2014 05:23 PM
Last Post: Salman
  CDA starts beautification of Jubilee Park in Sector F-7 Salman 0 3,262 02-21-2013 03:19 PM
Last Post: Salman
  CDA starts computerisation of estate records Salman 0 3,924 10-24-2012 02:13 PM
Last Post: Salman
  Infrastructure development starts in G-14 Salman 0 4,267 09-24-2012 04:17 PM
Last Post: Salman
  Flyover : commuters’ ordeal for ninety days starts on 9th Salman 0 4,342 09-07-2012 01:33 PM
Last Post: Salman
  Work on 6th Road flyover starts Salman 0 4,518 09-04-2012 02:13 PM
Last Post: Salman
  Villagers, CDA sort out issues as road starts Salman 0 4,640 08-30-2012 07:05 PM
Last Post: Salman
  Leh bridge safe for another 20 years: experts Salman 0 3,826 07-23-2012 12:29 PM
Last Post: Salman
  Alamgir starts tour to inspect NHA projects Salman 0 2,960 06-29-2012 07:45 PM
Last Post: Salman
  CDA starts demarcation of C-15, C-16 sectors Salman 0 4,577 04-14-2012 02:23 PM
Last Post: Salman
  CDA starts C-15, C-16 demarcation Salman 0 3,702 04-12-2012 01:12 PM
Last Post: Salman
  Campaign against wall-chalking starts Lahore_Real_Estate 0 3,644 02-10-2012 12:38 PM
Last Post: Lahore_Real_Estate
  KMC starts construction, repair of roads Salman 0 3,977 01-18-2012 11:52 AM
Last Post: Salman
  CDA starts auction process Salman 0 4,045 01-10-2012 11:54 AM
Last Post: Salman
  CDA starts Sector I-11 development work Lahore_Real_Estate 0 3,455 12-29-2011 11:25 AM
Last Post: Lahore_Real_Estate
  Gwadar: Winter Capital Starts Functiong Formally LRE 0 3,387 12-03-2011 03:52 AM
Last Post: LRE
  Gwadar Winter Capital: Process Starts LRE 3 7,758 11-23-2011 04:04 PM
Last Post: LRE
  New cargo clearance system starts functioning Lahore_Real_Estate 0 3,025 09-30-2011 05:34 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)