Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Rs 1,600m approved for Azadi Chowk shifting
11-18-2013, 12:16 PM (This post was last modified: 11-18-2013 01:52 PM by Salman.)
Post: #1
Rs 1,600m approved for Azadi Chowk shifting
Rs 1,600m approved for Azadi Chowk shifting

LAHORE: The Punjab government has given the go-ahead to the Lahore Development Authority (LDA) to initiate a project of shifting the Azadi Chowk Crossing and construction of a four-lane dual carriageway from the existing junction to Masti Gate to ease the traffic flow.

Under the project, named Alternate Route to Outer Circular Road from Azadi Chowk to Masti Gate, the LDA will shift the existing crossing 500 metres back from the Lady Willigdon Hospital Chowk toward the shrine of Baba Chatri wala. After shifting the crossing from the existing point, a four-lane two kilometre long dual carriageway would be constructed from Ahmad Ali Road toward Lorry Adda and Masti Gate.

The Planning and Development Working Party (PDWP) of the Punjab Planning and Development Department has approved the project design prepared by National Engineering Services of Pakistan (NESPAK).

The project, after completion, would not only provide signal free crossing to the Metro Bus but also ease the flow of intercity and intracity traffic.

LDA Chief Engineer Asrar Saeed told APP that LDA would start construction within the next couple of weeks and the project would be completed in six months. He added that funds had been released for the required land, which would be acquired from private owners including Ravi Charga. He said an operation against encroachments and illegal constructions would be launched to vacate government land from grabbers.
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  Traffic Plan Amid Cavalry Chowk Underpass Construction Issued LRE-Azan 0 49 09-12-2023 05:47 PM
Last Post: LRE-Azan
  PCBDDA Plans to Open Kalma Chowk Underpass by February 2023 LRE-Azan 0 424 01-25-2023 02:06 PM
Last Post: LRE-Azan
  Lahore Gulberg to Defence Chowk to be Made 5km Signal Free Corridor LRE-Azan 0 918 01-01-2022 06:51 PM
Last Post: LRE-Azan
  Rawal Dam Chowk Interchange likely to be completed by June 2022 LRE-Azan 0 1,176 12-15-2021 05:48 PM
Last Post: LRE-Azan
  CDA mulls shifting industrial zone Salman 0 4,230 02-26-2014 10:33 PM
Last Post: Salman
  Flyover on Azadi Chowk : LHC extends stay against demolition Salman 0 4,391 02-26-2014 10:23 PM
Last Post: Salman
  Rs. 1.5 billion Allotted For Azadi Chowk Flyover Salman 0 5,442 02-07-2014 07:34 PM
Last Post: Salman
  Work on Azadi Chowk Interchange, New Circular Road Project starts Salman 0 8,093 01-16-2014 01:55 PM
Last Post: Salman
  Mareer Chowk Railway Bridge finally becomes operational Salman 0 4,702 01-08-2014 02:43 PM
Last Post: Salman
  Mareer Chowk Bridge launching delayed again Salman 0 10,358 08-06-2013 11:08 AM
Last Post: Salman
  Mareer Chowk expansion project progressing at snail’s pace Salman 0 3,968 05-18-2013 12:34 PM
Last Post: Salman
  Revised PC-I of Mareer Chowk Project Approved Salman 0 3,975 04-25-2013 04:08 PM
Last Post: Salman
  Kalma Chowk underpasses open Salman 0 4,478 03-04-2013 11:22 AM
Last Post: Salman
  Caved in roads threaten China Chowk underpass Salman 0 3,947 02-25-2013 03:56 PM
Last Post: Salman
  Kalma Chowk Underpass inauguration on 26th Salman 0 4,089 02-21-2013 03:20 PM
Last Post: Salman
  Kalma Chowk opening delayed Salman 0 4,627 01-21-2013 05:19 PM
Last Post: Salman
  Mareer Chowk tunnel project to be completed by March 15 Salman 0 4,853 01-10-2013 01:25 PM
Last Post: Salman
  Kalma Chowk closed for traffic Salman 0 4,102 12-19-2012 05:23 PM
Last Post: Salman
  Plan to name chowk after Bhagat Singh dropped Salman 0 3,727 12-14-2012 01:01 PM
Last Post: Salman
  alma Chowk to remain closed for nine days Salman 0 4,094 12-12-2012 02:03 PM
Last Post: Salman

Forum Jump:


User(s) browsing this thread: 1 Guest(s)