Post Reply 
 
Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Construction of dual carriageway link road
10-14-2013, 04:11 PM
Post: #1
Construction of dual carriageway link road
Construction of dual carriageway link road
City Reporter

Monday, October 14, 2013 - Lahore—The Lahore Development Authority (LDA) has started construction of a new dual carriageway link road from LOS Ferozepur Road to Multan Road ending near Samanabad Mor to reduce travelling to Motorway M-2 and Ring Road at an estimated cost of Rs. 1846 million.

The contract of road construction has been granted through open tender to a private construction company while LDA and National Engineering Services of Pakistan (NESPAK) will supervise the project.

Under the project, the existing four kilometres long road alongside the Samanabad Nullah to Gulshan-e-Ravi would be rehabilitated and widened upto 60 feet consisting three lanes from each side. The construction of the road would be completed within the next six months and it would help ease the traffic flow of more than 50,000 vehicles daily besides reducing travelling time from Ferozepur Road to Motorway M-2 Babu Sabu Interchange.

In the first phase of the project, LDA has demolished illegal construction from the LOS side of the road while from Multan Road, Poonch House Colony, where dozens of illegal houses had been constructed, LDA will launch an operation during the current mont
Visit this user's website Find all posts by this user
Quote this message in a reply
Post Reply 


Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  LWMC has Launched an Operation to make Mall Road a Model road of the City LRE-Azan 0 1,490 08-09-2018 06:35 PM
Last Post: LRE-Azan
  Construction of 3 packages of Ring Road approved Salman 0 4,329 04-27-2015 01:41 PM
Last Post: Salman
  LDA completes 2.1km-long link road Salman 0 3,510 04-27-2015 01:40 PM
Last Post: Salman
  LDA invites applications For 1.5 kilometers long two-lane dual carriageway flyover Salman 0 4,045 03-17-2014 01:31 PM
Last Post: Salman
  Road construction: ‘Private investment too expensive’ Salman 0 2,626 03-06-2014 12:09 PM
Last Post: Salman
  LOS dual carriageway to be completed by May Salman 0 2,628 01-27-2014 07:10 PM
Last Post: Salman
  Khaira Distributory Road that links Package 17 of Ring Road to Ferozepur Road Salman 0 7,491 11-30-2013 12:48 PM
Last Post: Salman
  Lahore Ring Road Update : FWO to win Southern Loop construction contract Salman 0 18,058 11-05-2013 02:09 PM
Last Post: Salman
  Another bid to push Rs8 billion Benazir airport link road fails Salman 0 7,033 10-03-2013 01:19 PM
Last Post: Salman
  Link road to Benazir Airport could become Rs8 billion scam Salman 0 6,571 09-30-2013 03:45 PM
Last Post: Salman
  Road From LOS To Multan Road, Construction Work On The Go Salman 0 10,645 09-23-2013 03:18 PM
Last Post: Salman
  CDA also rejects new Rs8 bn link road to Benazir Bhutto airport Salman 0 4,920 09-16-2013 04:38 PM
Last Post: Salman
  Pakistan floats tender for major road construction Salman 0 6,956 09-02-2013 12:48 PM
Last Post: Salman
  RDA joins NHA in opposing Rs8 bn link road to Benazir Airport Salman 0 6,614 09-02-2013 12:41 PM
Last Post: Salman
  Link road to Benazir Airport could become Rs8 billion scam Salman 0 5,790 08-29-2013 12:29 PM
Last Post: Salman
  6th Road fly-over construction leads to traffic jam Salman 0 3,380 09-22-2012 05:10 PM
Last Post: Salman
  Plan finalised to link 7th Avenue with Murree Road Salman 0 3,894 07-04-2012 02:42 PM
Last Post: Salman
  LDA to widen road from Allama Iqbal Town to Multan Road Salman 0 6,154 05-29-2012 03:06 PM
Last Post: Salman
  Poor sanitation on Airport Link Road irks public Salman 0 3,437 03-29-2012 12:36 PM
Last Post: Salman
  Mall Road, MM Alam Road and Gulberg to get CCTV cameras Lahore_Real_Estate 0 5,379 02-10-2012 12:39 PM
Last Post: Lahore_Real_Estate

Forum Jump:


User(s) browsing this thread: 1 Guest(s)