Post Reply  Post Thread 
CDA fails to maintain main roads in Islamabad
Author Message
LRE - Salman
Super Moderator
******


Posts: 1,430
Group: Super Moderators
Joined: Oct 2011
Status: Online
Reputation: 0
Post: #1
CDA fails to maintain main roads in Islamabad

CDA fails to maintain main roads in Islamabad

Islamabad :The Capital Development Authority (CDA) might be facing severe financial constraints, but it does not cost too much to carry out maintenance of the existing road network. After paying no heed to plight of users of IJ Principal Road, which is ruining with the passage of each passing day, the civic body is also now ignoring roads of posh areas like Embassy Road where a four feet wide ditch awaits attention of the road directorate for the last several months.

Over the last two years, a number of ditches and rough patches had appeared on the I J Principal Road, which is busiest main road used by commuters plying between Rawalpindi and Islamabad and within the federal capital to go to their work places.

The I J Principal Road, which starts from Peshawar Road and ends at Faizabad was dualised and completed about ten years ago, but at that time no care was taken to provide a lane for heavy traffic. As a result, the overloaded vehicles have been playing havoc with the road causing rough patches at many spots.

The poor construction of this main road had resulted in appearance of ditches, which had widened but were never repaired by the road directorate of the civic body. “As I have to use IJ Principal Road while going to office and coming back, it is not possible for me to have a smooth drive,” Firdous Shahid, an employee in a government office at Sector H-8 said.

He said that drainage system on the road is also choked at different places particularly near Pindora Chungi and the road is inundated with water even when there is moderate rain.

He called upon CDA Chairman Farkhand Iqbal who himself is an engineer to undertake visit of IJ Principal Road, sectors I-9 and I-10. “But I fear the officials of engineering wing will keep him away from these areas,” he said.

The most deteriorated area having rough patches and ditches exists between Faizabad and Khyaban-e-Sir Syed.

Member Engineering Sanaullah Aman when contacted by this scribe said soon he would visit IJ Principal Road and sectors I-9 and I-10 so that necessary maintenance could be initiated.

He said that chairman of Prime Minister Task Force has also issued directives to take care of ignored residential sectors.

The engineering wing of the civic body has also not been able to maintain the old IJ Principal Road, which could supplement load of traffic on the dualised IJ Principal Road.

01-31-2012 01:25 PM
Find all posts by this user Quote this message in a reply
Post Reply  Post Thread 

Possibly Related Threads...
Thread: Author Replies: Views: Last Post
  CDA fails to complete uplift work in D-12 LRE - Salman 0 309 05-15-2013 04:45 PM
Last Post: LRE - Salman
  CDA’s negligence worsens condition of roads in Islamabad LRE - Salman 0 140 04-03-2013 04:47 PM
Last Post: LRE - Salman
  CDA digs up roads and leaves them like that LRE - Salman 0 218 01-24-2013 07:04 PM
Last Post: LRE - Salman
  CDA fails to execute parking plaza plan in capital LRE - Salman 0 312 12-26-2012 12:23 PM
Last Post: LRE - Salman
  Rawal Town roads to be renovated LRE - Salman 0 465 12-15-2012 05:20 PM
Last Post: LRE - Salman
  LDA to stop commercial activity on 48 roads LRE - Salman 0 415 12-14-2012 01:02 PM
Last Post: LRE - Salman
  Plea against conversion of two DHA roads allowed LRE - Salman 0 276 12-12-2012 01:59 PM
Last Post: LRE - Salman
  RDA fails to recover Rs5.9m after lapse of 17 years LRE - Salman 0 1,162 11-19-2012 12:16 PM
Last Post: LRE - Salman
  CDA fails to get land for Magalla Avenue extension LRE - Salman 0 1,011 10-08-2012 12:21 PM
Last Post: LRE - Salman
  Efforts urged to maintain Islamabad polio free LRE - Salman 0 460 10-06-2012 11:16 PM
Last Post: LRE - Salman
  Capital rain-hit roads need maintenance LRE - Salman 0 772 09-24-2012 04:16 PM
Last Post: LRE - Salman
  1,500km roads will be built in Sindh: CM LRE - Salman 0 1,118 09-19-2012 04:22 PM
Last Post: LRE - Salman
  Roads dug up for Metro Bus Service LRE - Salman 0 1,597 09-12-2012 11:34 AM
Last Post: LRE - Salman
  CDA fails to develop Park Enclave LRE - Salman 0 1,392 09-06-2012 03:22 PM
Last Post: LRE - Salman
  CDA ordered to maintain status quo in allotment of 27 plots LRE - Salman 0 379 07-31-2012 12:38 PM
Last Post: LRE - Salman
  Lack of parking facilities emerges as one of Islamabad’s main problems LRE - Salman 0 351 07-30-2012 12:22 PM
Last Post: LRE - Salman
  Roads worth Rs 39b to be constructed LRE - Salman 0 554 07-24-2012 05:30 PM
Last Post: LRE - Salman
  TMA fails to get dangerous buildings vacated LRE - Salman 0 685 07-23-2012 12:33 PM
Last Post: LRE - Salman
  DCO orders early completion of roads LRE - Salman 0 1,009 05-17-2012 01:29 PM
Last Post: LRE - Salman
  Rs 22.9b spent on roads in three years LRE - Salman 0 662 05-04-2012 12:53 PM
Last Post: LRE - Salman

View a Printable Version
Send this Thread to a Friend
Subscribe to this Thread | Add Thread to Favorites
Rate This Thread:

Forum Jump:

 

 Plots For Sale By Lahore Real Estate

 

Lahore Master Plan HTML

Lahore Master Plan Interactive Map